DB250125DWJ - CANCELLED - Long Term Lift Station Recovery & Hardening Phase 2 & 3A


Solicitation #:DB250125DWJ
Opening Date:4/15/2025  2:30 PM
Scope Of Work:Lee County Board of County Commissioners seeks to contract with a qualified Vendor to complete a Design-Build project that includes design, survey, permitting, Construction Engineering and Inspection (CEI), and construction services to permanently repair / replace up to 40 lift stations. See Appendix A – Map, to better understand the various locations of the lift stations across the County. The majority of the lift stations require control panel replacements with a new submersible control panel, up to eight (8) lift stations require generator replacements, and most lift stations require replacing miscellaneous materials. See Appendix C – FEMA DDD to see specific equipment and materials to be replaced at each lift station.