Task 2 - Identiication of Improvements

A total of 37 potential flood mitigation projects were identified through review of existing flood condition documents (including the Phase 2 report), studies, and post-Hurricane Irma flood photographs; interviewing local officials for flooding impacts in their relative areas; analysis of the watershed for potential concept projects for improving floodway conveyance and flood water storage components.

The concept projects below aimed to provide a network system of high-functioning conveyances and water control structures. This effort sets a ‘benchmark’ for comprehensive flood control needs on a regional basis and provides a ‘measuring stick’ as the County works towards regional flood mitigation improvements. While the viability of each concept is addressed at a high level using metrics of cost, environmental permitability, etc., each concept’s ability to mitigate flooding is the primary driver. The flood mitigation concepts are only intended to utilize the high-capacity conveyance functionality during severe storm events and not alter normal seasonal flows or hydroperiods.

Click map below to load an interactive map

Link to Interactive Map

Search
Main
Menu
Section
Navigation