All Development Orders and LCU Developer Contributed Asset Projects Submitted after 05/31/2024 are subject to the LCU Standard Details Below.

All Approval to Construct and Final Acceptance drawings submitted to LCU are to include LCU Standard Detail

Sheet(s). Only those details applicable for the construction of each specific project are to be included. LCU Details are NOT to be altered from their original format unless otherwise approved by LCU staff. They are to include the borders, LCU Standard Detail Number and revision blocks. 

For a comprehensive document containing all LCU Detail Drawings, click here.


General Details
Potable Water Details
Sanitary Sewer Details
Lift Station Details
Search
Main
Menu
Section
Navigation